Common PLC interview questions, with short answers
These are the questions that come up again and again. Each answer is short enough to say in an interview, and each links to a page where you can try it.
Answer, then show it
A spoken answer lands better when you can sketch the rung. Open FORGE, build the example and run it while you explain.
Questions and answers
What is the PLC scan cycle?
The PLC reads all inputs into an image, solves the program from top to bottom using that image, then writes the outputs. It repeats this continuously.
What is a seal-in circuit?
A seal-in uses the output’s own contact in parallel with the Start button, so the output stays on after Start is released until a Stop breaks the rung.
Why wire a Stop button normally closed?
A normally closed Stop is true while the device is healthy. A broken wire or a pressed button drops the rung, so the failure stops the motor instead of leaving it running.
What is the difference between a latch and an unlatch coil?
A latch coil sets an output and keeps it set across scans. A separate unlatch coil clears it. Neither one writes the output on every scan the way a plain coil does.
What does a one-shot do?
It makes a signal true for exactly one scan when an input changes, so an action happens once per press instead of on every scan the button is held.
How do you troubleshoot a rung that will not turn on?
Watch the live rung, follow the highlight from the left rail and find the first contact that is not true. That contact, or the tag behind it, is the fault.